The construction of the villa at Alcalá 70 is progressing in line with the revised schedule:

  • Structure and foundations: 100% completed
  • Facades: brickwork and waterproofing at 95%
  • Technical installations: water, drainage, and electrical systems at 95%
  • Interior finishes: plasterboard partitions at 98%, ceiling installations to follow
  • External joinery: window installation at 20%
  • Landscaping: initial works completed in the lower garden